AQUACYCLE: annonce préalable de l'appel d'offres pour des travaux de construction

image

Contenu disponible uniquement en anglais.

The Tender will be issued during July 2020 in the framework of the ENI CBC Med funded AQUACYCLE Project.

The Construction Works will require the design, building and maintenance of a demonstration wastewater treatment unit in the locality of Abu Samra, Jinan Campus (North of Lebanon).

The demonstration unit is to consist of Anaerobic Digestion, Constructed Wetland, and Solar Treatment Raceway. The unit must be able to treat 5m3 of domestic wastewater per day.

Full details of this pre-announcement are available on the website of the Lebanese University as the Contracting Party: http://www.biotech.ul.edu.lb/aquacycle/Call.html and download the document entitled ‘Pre-announcement: WASTEWATER UNIT CONSTRUCTION WORKS IN TRIPOLI (North Lebanon) ABU SAMRA’.